![5 Efarleigh](/media/tjhhx24z/5-efarleigh.jpg?anchor=center&mode=crop&width=1440&quality=80&rnd=133582779146630000)
w/c 15th April
19/04/24
-
Yalding
Twyford Bridge replacement project underway
-
Teston Lock
Silt removal took place.
-
Yalding
Pressure washing and maintenance of Anchor Sluice
-
East Farleigh
CCTV system installation to monitor sluice activity and deter anti-social behaviour.
-
East Farleigh
Silt removal from East Farleigh lock.