Next Allington Lock Tide: 7:18AM

Current Stream Status: Caution

16Of2025 Obstruction At Cannon Lane

RESOLVED - 16 of 2025 - River Obstructed at Cannon Lane Bridge, Tonbridge

watch_later 30/07/25

UPDATE 08/08/2025 - The trees have now been cleared.
__________________________________________________________________________________

The river is closed to navigation for powered craft downstream of Cannon Lane Bridge, Tonbridge, due to 2 trees that have fallen across the channel.

Waterways staff will work to clear these blockages from the w/c 4th August.

We apologise for any inconvenience caused in the meantime.

Related

River Status

warning_amber

River levels and flows above normal

Environment agency: 03708 506 506



Last updated: 30 Oct, 06:25 AM