2 of 2023 - Closure between Hampstead Lock and Sluice Weir Lock

watch_later 23/01/23

To allow for planned urgent works to Hampstead Sluice the river between Hampstead Lock and Sluice Weir will be drained on 9th February 2023 with a reinstatement date of 17th March 2023.

Where possible, water levels will be restored earlier than the date shown if the maintenance and inspection operations have been completed.

Related