Next Allington Lock Tide: 6:16AM

Current Stream Status: Caution

Liftingbridgeoperation

14 of 2023 - Yalding Lifting Bridge Reopened

watch_later 09/07/23

The Yalding Lifting Bridge has been repaired and is now open for public use as normal. The closure to navigation at this point has now been lifted.

Our team and their engineers were able to source the necessary components and work late to fit them in the evening of 8th July.

We apologise for any inconvenience caused by the closure, and appreciate your patience during this period.

Related

River Status

warning_amber

River levels and flows above normal

Environment agency: 03708 506 506



Last updated: 21 Dec, 22:10 PM