• Latest News

    22OF2025

    22 of 2025 - East Farleigh Sluice Repairs

    • Notice To Mariners

    watch_later 19/12/25

    UPDATE - 19/12/2025

    We can confirm that urgent works to Gate 2 at East Farleigh Sluice have been successfully completed. With Gate 2 restored to automatic operation, river levels can once again be effectively regulated to support navigation and reduce flood risk during periods of high flow. This represents a significant step in maintaining the safety and reliability of the sluice system.

    Gate 1 remains out of service. Comprehensive works are scheduled for spring 2026 to fully restore its operation. Until then, the repair of Gate 2 provides assurance that river levels can continue to be managed safely.

     

     

    ___________________________________________________________________________________

    This is reminder that due to ongoing sluice repair works, the upstream river level and air draught under East Farleigh Bridge cannot be guaranteed going into the winter. These conditions may vary significantly, especially following rainfall.

    We strongly advise all river users to exercise caution when navigating in this area and to remain alert to changing water levels and clearance heights.

    We are continuing to work urgently to resolve the sluice issue and will provide further updates as the situation develops.

    Anyone navigating the Medway should satisfy themselves of the room available at each bridge before attempting to navigate through.